Newbridge Subdivision Stages 2-6

Newbridge Subdivision Stages 2-6-1 Newbridge Subdivision Stages 2-6-2 Newbridge Subdivision Stages 2-6-3 Newbridge Subdivision Stages 2-6-4 Newbridge Subdivision Stages 2-6-5 Newbridge Subdivision Stages 2-6-6 Newbridge Subdivision Stages 2-6-7 Newbridge Subdivision Stages 2-6-8

Client: Burke Urban

Location: Murray Bridge

Contract Value: $8.6m

Description:

Formerly this 45-hectare parcel of magnificent land was the Murray Bridge Racing Club now it was repurposed with the development of 130 residential block. Newbridge is Murray Bridge’s newest neighbourhood, with leafy street trees providing shade, water-wise verge plantings, community reserves and tree-lined walking trails, offering residents a chance to wake up to nature and a new sense of calm every day.

Works Undertaken:

Newbridge involves the construction of roadworks and drainage, electrical and public lighting, common service trenching, water and sewer mains and connections and includes:

  •          Liaison and co-operation with service authorities,
  •          Preparation of management plans and QA,
  •          Setting out the works from established benchmarks and boundaries,
  •          Site clearing,
  •          Primary earthworks viz. boxing out of roadway, formation of footpaths, stockpiling of topsoil, filling, and compaction, etc.
  •          Allotment filling and compaction under Level 1 Supervision.
  •          Provide Council and the Superintendent a copy of the Level 1 fill certificate and accompanying survey.
  •          Stormwater construction (including CCTV to the satisfaction of Council and the Superintendent),
  •          Roadwork’s construction including - sub-grade preparation, road sub-base and base course construction, including block paving,
  •          Asphaltic concrete (hotmix) wearing course including before/after survey,
  •          Concrete works including - kerb and gutter, kerbing and spoon drain installation,
  •          Footpath construction along roadways (footpaths within reserves excluded)
  •          Construction of water mains (potable) and associated works, including:
  •          Excavation, supply, laying, testing and backfill of water mains and connections,
  •          Construction of fireplugs, stop valves, and other appurtenances including all covers required in accordance with standard details,
  •          Construction of Sewer drains, and associated works, including:
  •          Excavation, supply, laying, testing and back-fill of sewer mains and connections, including air testing and CCTV to the satisfaction of the Superintendent and SA Water,
  •          Construction of access chambers, inspection openings, connection inspection openings and other appurtenances including all covers required in accordance with standard details,
  •          Co-ordination of SA Water to install water connections off existing mains,
  •          Common service trenching,
  •          Electrical and street-lighting installation,
  •          NBN pit and conduit installation,
  •          Tidy up of footways after completion of common service trench,
  •          Locating and depthing of the existing site services prior to construction
  •          Reinstatement of existing roads affected by the new service installation works,
  •          Monitoring and repair to the existing haulage roads through the existing development,
  •          Traffic management within the site,
  •          Provision of ‘As Constructed’ survey,
  •          Provision of Street Signs to the Regional Council of Murray Bridge’s requirements